Clients & Projects

Clients & Projects

Allied Construction
Tolt Middle School – $10M
John Muir Elementary – $12M

Apollo Inc.
Bend Water Treatment Plant – $37M
US 95, Sandpoint to Kootenai – $13M
Picnic Point WTP – $80M
Swan Creek Bridges
Bozeman WTP

Atkinson Construction
I-405/SR-167 Direct Connector – $100M
West 520 Approach – $220M
Alaskan Way North Access – $42M
SR-520 Transit & HOV Design Build – $365M

Balfour Beatty Infrastructure
Caltrains Electrification – $700M
South Sacramento Corridor Rail – $89M
Transbay Transit Center – $210M
Sunnyside Wastewater Facility – $90M
Folsum South Canal Connection – $90M
San Mateo Bridge – $100M

General/Kiewit
Explosive Handling Wharf – $3M
Wanapum Dam Fish Bypass – $50M
Terminal 30 Upgrade – $30M
Dalles Dam Spillways 8/9 – $40M

Harbor Pacific
Renton Cogeneration Plant – $11M
Carnation Wastewater Trtmt Plant – $12M

Manson Construction
Elliott Bay Seawall
Terminal 18 North Apron Upgrade – $30M

Pacific Pile & Marine
Kodiak Pier 3 Replacement – $20M
Carl Moses Floating Breakwater – $13M
Swift Reservoir Fish Bypass – $10M
Kodiak Ferry Terminal

Scarsella Bros.
South Center Parkway Extension – $14M
Shore Road to Kitchen Dick Rd. US 101 – $27M
US 2 Snohomish River Bridge – $75M
Mellen St. to Blakeslee Junction I-5 $48M

Traylor Pacific
Chief Joe Gas Abatement Spillway – $17M
Port of San Diego Dredging

Tristate Construction
Bear Creek Hydro Design Build – $65M
I-405 Widening Design Build – $124M
Water Transmission Lines 1 & 2 – $25M
Henderson/ML King Tunnel & Pipelines – $40M

Triton Marine
Bangor Dry Dock Repair – $16M
Portsmouth Shipyard Drydock 1 Repair – $15M
Renovate BEQ-Bangor – $20M

Contact Us